 |
SELECT THE PROJECT
|
|
ENERGY 2/2
CONSTRUCTION OF A 60 KWP GRID CONNECTED PHOTOVOLTAIC PARK
for Th. & I. Klapakis Company in Chania, Crete.
|
|
INSTALLATION OF PERIMETER LIGHTING, WITH 24 LIGHTING POLES
equipped with Photovoltaic generators and accumulators, for storing energy during the day and using it during the night, at the E. Malamatinas and Son Industrial & Commercial SA winery.
|
FORESTRY INSPECTORATE OF DRAMA
Installation of a 6 kwp P/V system with 75 Wp Photovoltaic panels for providing power supply to a residential area in Frakto, Drama. |
|
INSTALLATION OF A P/V SYSTEM AT ARKTOUROS (AETOS, FLORINA)
with a power of 10 kwp and 75 Wp Photovoltaic panels, for providing power supply to the Company’s exhibition premises and facilities.
|
ARISTOTLE UNIVERSITY OF THESSALONIKI
Installation of a 1.3 kwp P/V system for providing power supply to the greenhouses at the Farm of A.U.Th. Faculty of Agriculture. |
|
|
|
|
 |
|
 |
THESSALONIKI : 55A, G. Gennimata str., 55132 Thessaloniki -Greece
Tel : +302310 471118, +302310 471382, Fax : +302310 471382
e-mail : neodomi@neodomi.gr
www.neodomi.gr
|
|
|
|
|